Quality Strength Technique Work

Spud-784x1024

  • 2 KB Turkish Get Ups
  • 2 KB Windmills
  • 4 KB Snatches

** Work on the right side, rest as needed then go through on the left side.
** 10 Min of work, adding weight when you can.

WOD #1 – 10 Min AMRAP

  • 20 Double Unders
  • 20 KB Snatches (10 on each side 55/35)

WOD #2 – 10 Min AMRAP

  • 10 Box Jumps (24/20)
  • 20 Single Arm KB Swings (10 on each side 55/35)

AB Work – 3 Rounds

Thea-605x1024

  • 30 Sec Plank
  • 15 Russian Twists (20/14)
  • 15 Ab Mats